POSTS
SEARCH
SHOP
  • Your Cart Is Empty!
Your address will show here +12 34 56 78
 
 INDUSTRIAL
PROJECTS
 

 

Logistics Hub - Package 4

The project is located at Bu Sulba; Turnkey construction of Warehouses MWH-1 Dry (B7b); MWH-2 AC (B10); 3 Nos. DWH-1 AC (B12); DWH-1 Chiller & Freezer (B14) & MWH-1 Mixed (B15) building works (Package – 4) in pre-engineered steel. The total built up area is 50,923 Sq.M

VILLAGIO Mall Extension

Turnkey construction in Steel. Project is located at front parking area of VILLAGIO Shopping Mall with an approximate total built-up area of 9,000 Sq.M

SEGMENT FACTORY for Metro GoldLine

Construction of Pre-Cast Segments Factory Building: size 60.4 M (W) x 184.0 M (L) for the METRO GOLD LINE Underground Tunnels

GWC WAREHOUSES & OFFICE FACILITIES

Turnkey construction in Steel. Total built-up area of 10,022 Sq.M of Hazardous Warehouse (2 Nos.) and Office Facilities

Delta Fabco Factory

Turnkey construction in Steel. Total Built-up area of 11,150 Sq.M. of Factory buildings (2 Nos.); Offices Building and external workss

Construction of Valves & Wellhead Factory

Turnkey construction in steel.The project consist of Factory & Administration Building; Guard Room & Compressor Room and external services

Al Bayader Pack Qatar Factory

Turnkey Construction in Steel. Built-up area 7,300 Sq.M of Showroom, offices, Factory, Warehouse & external works

Dary Factory

Turnkey Construction in Steel. Built-up area 12,000 Sq.M in (G+M) of Factory, Office and Store.

Korean Bakery Factory

Turnkey Construction in Steel. built-up area 5,200 Sq.M of Bakery, Offices, Chiller Yard, Dining, Store & external works

Al Naham Factory for Boats

Turnkey construction. Total built-up area of 10,604 Sq.M of Factory, Administration building, Guardroom, Substation, and Underground Fire Water tank, Pump room

Epsilone Chemical Factory

Turnkey construction. Total built-up area of 4,508 Sq.M of Factory, Administration building, Guardroom, Substation, and Underground Fire Water tank, Pump room

DAR AL NASEAG

Turnkey Construction in Steel. Built-up area 6,840 Sq.M of Factory Building, Office Building, Guard Room & External works.

Al Raed Fresh Fruit Factory

Turnkey Construction in Steel. Total built-up area 6,068 Sq.M of a factory building (Ground & Mezz. Floor); Administration Building (G+1+2); Guard Room and external services

SEGMENTS FACTORY for Metro GreenLine

Construction of Pre-Cast Segments Factory Building: size 60.4 M (W) x 192.0 M (L)

Factory for BITUMODE Qatar

Turnkey Construction in Steel. Total built-up area of 5,046 Sq.M of a production building (G+M); Mixing shed (GF); Administration Building (G+1+2); Thermal Boiler room (GF); Electrical & Compressor Room / Control Room (GF); Guard Room (GF) and external services

Rayyan Water New factory

Turnkey Construction in Steel. Built-up area 4,554 Sq.M of Factory (G+M+Flat Roof) & External works.

IV SOLUTION FACTORY (QATAR PHARMA)

Turnkey construction in Steel. Total built-up area of 8,357 Sq.M of a Warehouse Building of size (124.6m x 60.85m) with additional mezzanine floor; sub-station building and external services

Extension to DOHA EXTRACO Factory

Turnkey construction. Total built-up area of 3,558 Sq.M of Production building

Wooden Products Factory

Turnkey construction. Total built-up area of 2,956 Sq.M of Factory, Guardroom, Substation, Fire Water Tank

Mannai Development at Birkat Al Awamer (Phase 1 & 2)

Turnkey construction in Steel. Total built-up area of 1,255 Sq.M of a Material Store in PEB; Pump Room in PEB and Guard room in Porta cabin

Erkat: Ground + Mezz. Floor Factory

Turnkey construction in Steel. Total built-up area of 3,011 Sq.M of Factory building consisting of Workshop and Office area; Guard Room; MV Room & Sub-station;

Fanar Factory

Turnkey Construction in Steel. Total built-up area of 4,445 Sq.M of a factory building (G+M) and external services

Extension to Rayyan Water Factory

Turnkey construction in Steel. Total built-up area of 1950 Sq.M of Ground Floor and Mezzanine Floor Factory building

RAYYAN: MANUFACTURING UNITS OF WATER TANKS

Turnkey construction in Steel. Total built-up area of 3,571 Sq.M of Factory building; Attached G+1 Office Building in Concret...

Modification to existing store with additional mezzanine floor

Turnkey construction in Steel. Total built-up area of 848 Sq.M of Additional Mezzanine; Pump room & external works

FACTORY BUILDING (Supply & Erec)

Supply & erection of Steel Building. Built-up area 3,200 Sq.M of Factory (G+M) & External works.

GRC Factory

Turnkey Construction in Steel. Total built-up area of 3,466 Sq.M of Factory Building (G+M), Administration Building (G+1) & External works.

ADDITIONAL STORE FOR AL MANNAI

Turnkey Construction in Steel. Total built-up area of 3,466 Sq.M of Factory Building (G+M), Administration Building (G+1) & External works.

Al MANHAL Water New Factory

Turnkey Construction in Steel. Built-up area 1,747 Sq.M of Factory (G+M) & External works.

Food Factory

Turnkey Construction in Steel. Built-up area 794 Sq.M of Factory (G+M) & External works.

GPSC STORES & ACCOMMODATION

Turnkey Construction in Steel. Built-up area 2,150 Sq.M of Store, office, G+2 Accommodation & External works.

GARAGE & LABOUR ACCOMMODATION

Design-Build Construction in Steel. Built-up area 2,278 Sq.M of G+2 Labour Accommodation(3 Nos.), office, Store & external works

LANDMARK Expansion

Turnkey Construction in Steel. Built-up area 2,800 Sq.M of Extn. # 3, 4 & 5 to the Landmark Shopping Mall

ID DESIGN STORES, OFFICES & RESIDENCE

Turnkey Construction in Steel. Built-up area 2,150 Sq.M of Store, office, G+2 Accommodation & External works.

BTC Warehouse

Turnkey Construction in Steel. Built-up area 3,450 Sq.M of a Store Building.

UBD STORE & LABOUR ACCOMMODATION

Turnkey Construction in Steel. built-up area 5,200 Sq.M of Bakery, Offices, Chiller Yard, Dining, Store & external works