Logistics Hub - Package 4
The project is located at Bu Sulba; Turnkey construction of Warehouses MWH-1 Dry (B7b); MWH-2 AC (B10); 3 Nos. DWH-1 AC (B12); DWH-1 Chiller & Freezer (B14) & MWH-1 Mixed (B15) building works (Package – 4) in pre-engineered steel. The total built up area is 50,923 Sq.M
VILLAGIO Mall Extension
Turnkey construction in Steel. Project is located at front parking area of VILLAGIO Shopping Mall with an approximate total built-up area of 9,000 Sq.M
SEGMENT FACTORY for Metro GoldLine
Construction of Pre-Cast Segments Factory Building: size 60.4 M (W) x 184.0 M (L) for the METRO GOLD LINE Underground Tunnels
GWC WAREHOUSES & OFFICE FACILITIES
Turnkey construction in Steel. Total built-up area of 10,022 Sq.M of Hazardous Warehouse (2 Nos.) and Office Facilities
Delta Fabco Factory
Turnkey construction in Steel. Total Built-up area of 11,150 Sq.M. of Factory buildings (2 Nos.); Offices Building and external workss
Construction of Valves & Wellhead Factory
Turnkey construction in steel.The project consist of Factory & Administration Building; Guard Room & Compressor Room and external services
Al Bayader Pack Qatar Factory
Turnkey Construction in Steel. Built-up area 7,300 Sq.M of Showroom, offices, Factory, Warehouse & external works
Dary Factory
Turnkey Construction in Steel. Built-up area 12,000 Sq.M in (G+M) of Factory, Office and Store.
Korean Bakery Factory
Turnkey Construction in Steel. built-up area 5,200 Sq.M of Bakery, Offices, Chiller Yard, Dining, Store & external works
Al Naham Factory for Boats
Turnkey construction. Total built-up area of 10,604 Sq.M of Factory, Administration building, Guardroom, Substation, and Underground Fire Water tank, Pump room
Epsilone Chemical Factory
Turnkey construction. Total built-up area of 4,508 Sq.M of Factory, Administration building, Guardroom, Substation, and Underground Fire Water tank, Pump room
DAR AL NASEAG
Turnkey Construction in Steel. Built-up area 6,840 Sq.M of Factory Building, Office Building, Guard Room & External works.
Al Raed Fresh Fruit Factory
Turnkey Construction in Steel. Total built-up area 6,068 Sq.M of a factory building (Ground & Mezz. Floor); Administration Building (G+1+2); Guard Room and external services
SEGMENTS FACTORY for Metro GreenLine
Construction of Pre-Cast Segments Factory Building: size 60.4 M (W) x 192.0 M (L)
Factory for BITUMODE Qatar
Turnkey Construction in Steel. Total built-up area of 5,046 Sq.M of a production building (G+M); Mixing shed (GF); Administration Building (G+1+2); Thermal Boiler room (GF); Electrical & Compressor Room / Control Room (GF); Guard Room (GF) and external services
Rayyan Water New factory
Turnkey Construction in Steel. Built-up area 4,554 Sq.M of Factory (G+M+Flat Roof) & External works.
IV SOLUTION FACTORY (QATAR PHARMA)
Turnkey construction in Steel. Total built-up area of 8,357 Sq.M of a Warehouse Building of size (124.6m x 60.85m) with additional mezzanine floor; sub-station building and external services
Extension to DOHA EXTRACO Factory
Turnkey construction. Total built-up area of 3,558 Sq.M of Production building
Wooden Products Factory
Turnkey construction. Total built-up area of 2,956 Sq.M of Factory, Guardroom, Substation, Fire Water Tank
Mannai Development at Birkat Al Awamer (Phase 1 & 2)
Turnkey construction in Steel. Total built-up area of 1,255 Sq.M of a Material Store in PEB; Pump Room in PEB and Guard room in Porta cabin
Erkat: Ground + Mezz. Floor Factory
Turnkey construction in Steel. Total built-up area of 3,011 Sq.M of Factory building consisting of Workshop and Office area; Guard Room; MV Room & Sub-station;
Fanar Factory
Turnkey Construction in Steel. Total built-up area of 4,445 Sq.M of a factory building (G+M) and external services
Extension to Rayyan Water Factory
Turnkey construction in Steel. Total built-up area of 1950 Sq.M of Ground Floor and Mezzanine Floor Factory building
RAYYAN: MANUFACTURING UNITS OF WATER TANKS
Turnkey construction in Steel. Total built-up area of 3,571 Sq.M of Factory building; Attached G+1 Office Building in Concret...
Modification to existing store with additional mezzanine floor
Turnkey construction in Steel. Total built-up area of 848 Sq.M of Additional Mezzanine; Pump room & external works
FACTORY BUILDING (Supply & Erec)
Supply & erection of Steel Building. Built-up area 3,200 Sq.M of Factory (G+M) & External works.
GRC Factory
Turnkey Construction in Steel. Total built-up area of 3,466 Sq.M of Factory Building (G+M), Administration Building (G+1) & External works.
ADDITIONAL STORE FOR AL MANNAI
Turnkey Construction in Steel. Total built-up area of 3,466 Sq.M of Factory Building (G+M), Administration Building (G+1) & External works.
Al MANHAL Water New Factory
Turnkey Construction in Steel. Built-up area 1,747 Sq.M of Factory (G+M) & External works.
Food Factory
Turnkey Construction in Steel. Built-up area 794 Sq.M of Factory (G+M) & External works.
GPSC STORES & ACCOMMODATION
Turnkey Construction in Steel. Built-up area 2,150 Sq.M of Store, office, G+2 Accommodation & External works.
GARAGE & LABOUR ACCOMMODATION
Design-Build Construction in Steel. Built-up area 2,278 Sq.M of G+2 Labour Accommodation(3 Nos.), office, Store & external works
LANDMARK Expansion
Turnkey Construction in Steel. Built-up area 2,800 Sq.M of Extn. # 3, 4 & 5 to the Landmark Shopping Mall
ID DESIGN STORES, OFFICES & RESIDENCE
Turnkey Construction in Steel. Built-up area 2,150 Sq.M of Store, office, G+2 Accommodation & External works.
BTC Warehouse
Turnkey Construction in Steel. Built-up area 3,450 Sq.M of a Store Building.
UBD STORE & LABOUR ACCOMMODATION
Turnkey Construction in Steel. built-up area 5,200 Sq.M of Bakery, Offices, Chiller Yard, Dining, Store & external works